Tata Power’s CGPL has announced commercial operations of all five 800 MW sized units of Mundra UMPP. Unit 1, 2, 3, 4 and 5 were commissioned in March ’12, July ’12, Dec. ’12, Jan. ’13 and March ‘13 respectively.
Mundra UMPP is the first of the UMPPs that heralds the entry of 800 MW supercritical boiler technology in India, which is environment friendly and efficient. This technology and the choice of unit sizes helps save fuel for the project and cut down Green House Gas (GHG) emissions up to 15% as compared to sub-critical coal-fired power stations.
This project meets @ 2% of India’s power need.
Requirement /Situation:-
Tata Power started a green field project at Remote location and being a Giga size of the plant, they were in need of localize power which is Mobile and Modular in nature and support construction activities with safety and reliability.
Gujarat Powerfield offered them Mobile, Modular Rental DG Sets of various rating along with required ancillaries to match their requirement along with Operation.
Solution:-
Gujarat Powerfield execute this project supplying various rating DG Sets and ensure construction activities continue without any stoppage. Gujarat Powerfield successfully manage all the difficulties during execution which normally come across on construction site with heavy construction, high level movement of heavy vehicle, etc.
Entire Gujarat Powerfield team still cherish the experience during this project and feel proud to be a part of such massive and highly technological plant construction.
In addition to the Construction phase, we runs the DG Sets for their Standby utilization also for almost 06 years.
Reasons to choose Gujarat Powerfield:-
- Commitment for continuous power.
- Inhouse service capabilities
- Availability of Equipment and ancillaries
- Equipment with better safety and reliability
- Capability for Fast execution.